Capacity:
Location
Application Scenario:
Deploying floating PV in subsidence areas faces challenges such as unstable underwater terrain, soft sediment with low bearing capacity, and complex environmental constraints, requiring specialized anchoring systems and adaptive designs to ensure stability and durability.
The project's overall design was executed to high standards, ensuring quality control from the outset for the integrated floating PV and coal mining subsidence area management initiative. The system employs Yangguang Floating PV’s buoy and connector solution, forming a high-strength flexible floating array. Tailored to local submerged terrain features and complex subaqueous conditions, the design delivers a customized solution based on maximum water level operating standards.